Any deck supporting a hot tub or other extraordinary load requires alberta engineer stamped design for all deck and all connections including ledger board connection to house wall.
City of edmonton deck regulations.
If you are building a deck in the city of edmonton you may require a deck permit.
If you are building a rear deck lower then 24 in height uncovered you do not need to apply for a permit in edmonton.
Learn more at edmonton ca covid 19.
If you live in the city of edmonton a permit is not required if the deck you are building is less than 0 6 metres high and if it is entirely built in the back yard.
The deck can be built before final grade survey.
Less than 0 6 metres 24 inches above the ground at every point.
Fully situated in the rear yard.
Does not have a roof or walls.
I contacted city s lot grading department who advised to ensure land surveyor shows the new deck on your final grade survey.
You do not require an edmonton deck permit or prior authorization if you are planning on building a deck that meets all three of the following criteria.
By permitech on november 15 2016.
It also has to be compliant with the city s zoning bylaws ensuring that it is following rules and regulations for the development of land in edmonton.
Compliant with setback regulations stated in section 44 of the zoning bylaw 12800.
You can also contact lot grading at the city 1 780 496 5576 these guys were actually very helpful in answering a lot of my questions.
Entirely located within a back or side yard.
Effective august 1 2020 wearing a mask or face covering is mandatory in all indoor public places and public vehicles.
Learn more at edmonton ca covid 19.
Nominal imperial dimensions are listed.
Decks 24 to 5 10 180 cm need 36 guards and anything above 5 10 requires a 42 high railing.
For structures not attached to a house and containing a roof or walls see detached garage and shed.
Effective august 1 2020 wearing a mask or face covering is mandatory in all indoor public places and public vehicles.
Ensure minimum clearance of 3 5 m 11 6 above deck walking surface to electrical wires.
Permits development and construction current page navigation skip to content.
Not located on a corner lot.
5 4 decking on joist support 16 on centre or 1 decking on joist support 24 on centre.
However not all decks require a development permit or a building permit.
City of edmonton deck permits.
Permits are not required when a deck is.
Deck guard foundation deck guard is non climbable between 5 35 above surface no gaps greater than 100mm 4 in or under the deck guard guard height minimum 0 9m 36 lumber.